Location:
Fort Bragg, North Carolina
Size:
160,000 SY
Cost:
$25,800,000
Description:
The reconstruction of approximately 160,000 SY of apron pavement included a subdrainage system, grading and drainage, construction safety and phasing, as well as the analysis and master planning of the existing storm drainage system for a 54 acre contributory area. Also included was master planning for aircraft parking for not only the project areas, but for the entire apron.