Pope Army Airfield Repair Failed Airfield Pavement

Location:

Fort Bragg, North Carolina

Size:

160,000 SY

Cost:

$25,800,000

Description:

The reconstruction of approximately 160,000 SY of apron pavement included a subdrainage system, grading and drainage, construction safety and phasing, as well as the analysis and master planning of the existing storm drainage system for a 54 acre contributory area. Also included was master planning for aircraft parking for not only the project areas, but for the entire apron.